PHOTOS: Taken a close-up look at the new bridge yet?

This afternoon, we’ll be on a media tour promising a look at and inside the bridge. In advance of that, we went over for a closer look from the construction perimeter, and there’s lots to see!
bridgewide
bridgerailguy
towerotherside
onegear
Along the south side of the bridge, a raingarden and permeable-pavement path are visible:
raingardenlookingsouth
permeablepavement
raingarden
gears
bridgeleaf
Watch for a separate gallery later with what we see on and inside the bridge. More details on the bridge construction are here; and remember, the big party starts at noon Sunday, dedication 3 pm, street party (with Lucha Libre at 6 pm) continuing into the night. The bridge doesn’t officially open for traffic until Monday, June 30th – four years to the day after the old bridge was closed for good. (Photos by TSPN co-publisher Patrick Sand)

No Comments - Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>